Flat Preloader Icon

Studies of RES and Biomass Projects

Pilot Units

• Pilot plant for the production of biogas through the fusion of expired cheese products with agricultural and livestock waste in the West of Nicosia in Cyprus

• Pilot system of photobioreactor and anaerobic digester with temperature and pH control systems and with appropriate software to monitor their operation, for biogas production, for the Hellenic Agricultural Organization "DIMITRA"/Institute of Agricultural Products Technology

• Pilot plant for co-digestion of expired food products from supermarkets with used disposal nappies from kindergartens to produce biogas and hot water in the Municipality of Chalandri 

Studies

• Environmental Assessment Study for the management and utilization of agricultural wastewater through an anaerobic digestion system of a facility in the cross-border region of Greece – Italy
• Design and Techno-economic Analysis Study for the construction of a cheese factory waste utilization unit for biogas production in the Municipality of Erymanthos
• Environmental Impact Study of photovoltaic parks at the Industrial area of Patras
• Environmental Impact Study of a photovoltaic park, in the Municipality of Aitolikos 

• Environmental Impact Study of a photovoltaic park, in the Municipality of Movris 

• Environmental Impact Study of a photovoltaic park, in the Municipality of Tritaia 

• Environmental Impact Study of a photovoltaic park, in the Municipality of Naxos 

• Preliminary Environmental Impact Assessment of a photovoltaic park in the Municipality of Movris 

• Studies for solar park installations in the Municipality of Vrachneika 

• Study for the installation of a photovoltaic park, in the Municipality of Farrai 

• Study for the installation of a photovoltaic park, in the Municipality of Chalkia 

 

• Preliminary approval of the location for a hydroelectric power plant utilizing water from the Ladon River, Prefecture of Achaia

• Preliminary study approval of the location for a hydroelectric power plant utilizing water on the Kalamas River in the Municipality of Zitsa

• Environmental Impact Study for a Hydroelectric Plant on the Vouraikos River in the Municipality of Diakopto 

• Preliminary study approval of the location for a Hydroelectric Plant on the Krathi River in the Municipality of Akrata

• Preliminary study approval of the location for a Hydroelectric Plant on the upper Erymanthos River

• Preliminary study approval of the location for a Hydroelectric Plant on the lower Erymanthos River 

• Preliminary study approval of the location for a Hydroelectric Plant on the upper Selinunda River 

• Preliminary study approval of the location for a Hydroelectric Plant on the lower Selinunda River 

• Preliminary study approval of the location for a Hydroelectric Plant in the Manesaikos Stream